Construction Job Listings in Maine
Showing 201 - 230 of total 230 job listings for construction jobs in Maine
Supervisor - Electric System Engineer at Central Maine Power Company (Augusta, ME)
Tue, 06 Jan 2009 01:44:22 GMT
Senior Estimator- Structural Steel Fabrication Job #T1088-529 at resumes365 (Pittsfield, ME)
Tue, 30 Dec 2008 03:28:53 GMT
Lead Substation Engineer - Electrical Engineer at New York State Electric and Gas (Augusta, ME)
Tue, 06 Jan 2009 01:38:08 GMT
will perform electrical engineering for the construction of high voltage electrical substations including... Develops design and construction standards, determine...
Ship-to-Shore Crane Engineer or Service Technician (m/f) with focus on electronics/electrics at Flohr GmbH (Lagos, Nigeria, ME)
Wed, 10 Dec 2008 07:57:19 GMT
to design, procurement, construction, repair and... distribution up to 11 kV, Compressors, Pumps, Construction of any kind of steel structure, Cranes - Diesel...
Electrical Engineer Job #T307 at Resumes365 (Portland, ME)
Wed, 31 Dec 2008 02:35:38 GMT
eLearning application to adult learning HTML design experience (ex. Web page construction and design), Action script, JavaScript Macromedia Flash MX software...
Manager, Operations at Nestle Waters North America (Hollis Center, ME)
Fri, 09 Jan 2009 11:52:39 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Carpenter at Maine Department of Labor (Limestone, ME)
Tue, 30 Dec 2008 13:31:36 GMT
General Carpenter is needed for Brooker Construction in Limestone. Pay will depend on experience. Own set of tools are required for this job. Job will start...
Aviation Land Development Engineer at Stantec (Portland, ME)
Fri, 09 Jan 2009 14:53:36 GMT
terminal upgrades and landside improvements. Duties to include design and/or construction inspection services. This position will be working with professional...
Project Superintendent at Maine Department of Labor (Bar Harbor, ME)
Thu, 01 Jan 2009 13:11:39 GMT
in Mount Desert Island, Maine . Must be familiar with winter conditions in construction, be able to read plans and layout and have experience with yard piping...
Laborer at Maine Department of Labor (Lisbon, ME)
Wed, 24 Dec 2008 12:34:02 GMT
to and involving bagging up and removing construction materials in basements, crawl spaces and attics... using hand tools, construction terminology and using...
Fire Protection Analyst at ISO (Portland, ME)
Thu, 08 Jan 2009 12:02:48 GMT
and/or experience: 1. Knowledge of property fire insurance and building construction 2. Prior field experience performing detailed property insurance analysis 3...
Manager, Blow Mold at Nestle Waters North America (Poland, ME)
Fri, 02 Jan 2009 11:56:38 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Laborer - F/T Temp. at Maine Department of Labor (Augusta, ME)
Wed, 24 Dec 2008 11:49:33 GMT
respirators, hard hats, eye protection and steel toed boots during construction activities. All workers are expected to adhere to all OSHA requirements and...
Engineer 1 at Maine Department of Labor (Portland, ME)
Wed, 31 Dec 2008 14:46:59 GMT
level engineering support in many of the following areas: planning, design and construction of site civil, water, and wastewater projects primarily focused in...
Electrical Engineer - Aviation at Stantec (Portland, ME)
Sat, 03 Jan 2009 11:45:34 GMT
facilitation, potential revenue generation, conceptual and final design, construction support, and ongoing infrastructure management. **The Aviation Division of...
Technical Specialist at Maine Department of Labor (Augusta, ME)
Tue, 23 Dec 2008 12:20:18 GMT
and designs structural practices; provides construction inspections and documents final check -outs of... practices under construction, resolves minor problems...
New Construction Sales Rep at Honeywell (Westbrook, ME)
Tue, 30 Dec 2008 12:05:50 GMT
Honeywell Building Solutions (HBS) is a $2.6 billion business that installs and maintains the systems to help keep buildings and facilities safe, secure...
Conservationist Specialist at Maine Department of Labor (Houlton, ME)
Tue, 23 Dec 2008 16:21:06 GMT
management practices or surveys and designs structural practices; provides construction inspection and final as builds; documents final check outs to practices...
Flaggers at Maine Department of Labor (Holden, ME)
Wed, 17 Dec 2008 07:26:09 GMT
greater Bangor and surrounding areas. Duties are to control traffic around construction, utility and other jobsites that are utilizing part of the roadway. Free...
Structural Engineer-In-Training at Stantec (Scarborough, ME)
Fri, 19 Dec 2008 05:03:37 GMT
construction drawings and specifications • Develop construction quantities, estimate construction costs... field to monitor construction activities and produce...
Installation Project Manager at Honeywell (Westbrook, ME)
Fri, 09 Jan 2009 12:05:05 GMT
1-2 years experience in the engineering supervision or management of construction related projects, building management or other departmental management and...
Field Service Technician - HVAC / DDC Automation Systems - B at Honeywell (Brewer, ME)
Fri, 09 Jan 2009 12:04:06 GMT
HVAC, Security, Network, and Fire Alarm Systems in a commercial, process, construction and/or retrofit environment. This position requires a high level of...
Engineering Technician Level III at Maine Department of Labor (Old Town, ME)
Fri, 12 Dec 2008 06:57:25 GMT
document quality control, plan take offs and cost estimating and field construction overview. Working knowledge of Word and Excel is also desired. An Associate...
Manager, Operations at Nestle (Hollis, ME)
Fri, 26 Dec 2008 12:21:58 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer I, Engrg at General Dynamics (Bath, ME)
Wed, 24 Dec 2008 11:24:32 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Utility Field Superintendent PittsfieldME12081335 at MPC and Company (Pittsfield, ME)
Thu, 08 Jan 2009 23:45:07 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
Engineer III, Engineering at General Dynamics (Bath, ME)
Wed, 17 Dec 2008 16:12:04 GMT
is embarking on a period of explosive growth. In preparation for the construction of several new factories in the next 3-5 years, we are looking for supply...
|